mars distance from the sun in au

specification section 16010

Training period shall be performed within one (1), two (2) week period. Where pipe sleeves are installed in non-rated CMU walls fire rated sealant materials are not required. This Section of the Specifications and its accompanying Drawings are made It is mandatory to procure user consent prior to running these cookies on your website. Perform equipment tests as indicated and directed by the manufacturer, and as specified in Section 16010 and Sections of the Specification specifying equipment and/or systems. For compressorized equipment include an additional three (3) year Guarantee/Warranty Period. 0000003026 00000 n Available, on site, at all times during construction. The work to be done under this Division of the Specifications consists of the provided by the general contractor and/or his subcontractors shall be guaranteed and warranted to be free from defects in workmanship and materials for a period of two (2) years after date of certificate of completion and acceptance of work by UMB. h. Fire rated wall and floor penetrations. Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. SECTION 16010 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 Description This Division includes the complete installation of power, control, instrumentation, wiring, lighting, and other electrical systems as specified in the Sections of Division 16. HWr8}W+mY4A7[SJhhH Fo7 RX O7/?. HdSMo0W(jId]6t=K"N[ #$_^K.!Ze9dV0rOV\J`F@K6c,td6_b!JUjke3UK^mSw\,}GAqsv@qhnb/mWRj+'jXo4Zg|%>S9|WVTRn'p#X18G\R%0L|["l\pzJxFqLxX#4\;c?(=;7HZ\Y6+I(1LDe[9mAMwd]U'Gh-cEIV\# ,4cJ%P)iqOD%1x1Z=. Installer of specialized systems such as Fire Alarms, telecommunication systems, etc. . Time of instruction shall be designated by the Owner. 904 0 obj <>stream Identification systems. Permit must be approved by UMB Department of Operations and Maintenance prior to performing energized work. Each and every punch list item shall be initialed and dated by the Contractor when the work is complete. SCOPE OF WORK . Corresponding floor plans showing only this particular system with conduit and wire runs between points. The layered electronic files shall allow building elements, building systems and sub systems to be viewed in isolation or in combinations that are user selectable when the drawing files are being displayed. EN. Preliminary programming information. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. COMAR (Code of Maryland Regulations). Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. Outages should be scheduled a minimum of ten (10) days in advance. 16 ELECTRICAL GENERAL REQUIREMENTS Section 16010 END OF SECTION 260000 University of Maryland, Baltimore Bressler Research Building Seventh Floor Renovation Project No. B. These cookies do not store any personal information. Using the UMB Standard O&M Manual Template referenced in Division 01 Closeout Procedures insert the submittal files include both a bookmark and tree structure for accessing each submittal file in the manual. REFERENCED ORGANIZATIONS AND CODES The following list of abbreviations are included within the specifications and are provided as a reference. Motor manufacturer, motor type or model . Omission of words or phrases such as "the Contractor shall", "as shown on These cookies will be stored in your browser only with your consent. endstream endobj 575 0 obj <>stream Any conduit abandoned in concrete slabs, walls, or other inaccessible locations shall be left with a nylon pull wire. 0000001264 00000 n Supplementary Conditions and Division-1 Specification Sections, apply to this Section. Patch finished surfaces and building components using new materials specified for the original installation and experienced Installers. .2 Section 01810 -Commissioning. "$u D2iH>`:\ &Ea 16010 - 1 . Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. 16010 - 1 . Product data as specified in the electrical specifications unless otherwise noted: Warranties and maintenance instructions shall be included in the O & M Manual only. %PDF-1.5 Fully qualified and experienced in such work. NETA (National Electrical Testing Association). Only one submission per System Integrator will be allowed. GROUTING Install nonmetallic nonshrink grout for electrical equipment base bearing surfaces and anchors. The mark-ups shall be legibly marked in red pencil to show all changes and departures of the installation as compared with the original design. endstream endobj 1821 0 obj <>/Metadata 144 0 R/Outlines 346 0 R/Pages 1811 0 R/StructTreeRoot 599 0 R/Type/Catalog>> endobj 1822 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> endobj 1823 0 obj <>stream VARIANCES Where variances occur between the drawings and specifications or within either document itself, the item or arrangement of better quality, greater quantity or higher cost shall be included in the contract price. endstream endobj 879 0 obj <. 4284 0 obj <>stream Upon written instructions from UMB, uncover and restore Work to provide for UMB observation of concealed Work. 264 15 If any items have been initialed as being completed by the Contractor and the Architect/Engineer determines that the work is not complete, the Architect/Engineer shall be reimbursed by the Contractor at his regular hourly rate for any and all items requiring revisiting of the site by the Architect/Engineer. Adjustment. Narrow Section Ball Bearings (16000, 16100). Compliance with the requirements of NFPA 70E is subject to ongoing inspection by University personnel and failure to comply will result in an immediate Stop Work order being issued and enforced at the contractors expense. Maximum length: (six 6) feet, except where fished. SECTION 16010 -- GENERAL PROVISIONS DEFINITIONS Accepted/Approved: Shall mean accepted by the Project Representative. SECTION 16010 - GENERAL PROVISIONS. vol. . Cleaning. 1.1 GENERAL REQUIREMENTS: A. INSTALLERS QUALIFICATIONS Electrical Installer shall submit the following evidence: Five (5) comparable completed projects. o}B UJV5tM|w{&3cO*vnIg\6u(A2(^`h``h` @y40u@$X #X(Rp@1f As part of instruction for operating equipment, demonstrate the following procedures: Start up. endobj 1.1 GENERAL CONDITIONS . %PDF-1.5 % Unless otherwise indicated in each specification section, contractors may submit material and equipment by non listed manufacturers provided said submittals meet the requirements of these specifications. Emergency operations. This website uses cookies to improve your experience while you navigate through the website. At a minimum, prepare coordination drawings for all mechanical rooms, electrical rooms and substation rooms. Test data for equipment, shielded cables and supply voltage shall be submitted to the District. SECTION 16010 BASIC ELECTRICAL REQUIREMENTS . Remove conduit, hangers, supports, etc. Make all necessary investigations as to locations of utilities and all other matters which can affect the work. Place grout to completely fill equipment bases. are not concealed by new work. SECTION 16012 -- SUBMITTALS CONTRACTOR'S CERTIFICATION: Each submittal shall contain a certification stating that the . Housekeeping Pads: Set all floor-mounted equipment on four (4) inch high concrete housekeeping pads, unless otherwise shown or specified. In addition to the following list, submit other shop drawings as may be requested by UMB: Divisions 26, 27, & 28: Compression Wire Connectors Fire Resistant Sealant Ground Wire Surface Raceway Wireways Raceway, Boxes and Cabinets Wires and Cables Fire Alarm System: Refer to Division 28 Section Digital, Addressable Fire Alarm System for submittal requirements In instances of complex field wired systems, including but not limited to: fire alarm system, the contractor shall submit: Cut sheets of every component such as control panels, fire alarm devices, wire, etc. Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. 3. endstream endobj 2007 0 obj <>/Metadata 75 0 R/Outlines 81 0 R/PageLayout/OneColumn/Pages 1999 0 R/StructTreeRoot 196 0 R/Type/Catalog>> endobj 2008 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 2009 0 obj <>stream Provide connectors with insulating bushings. ']xOs 0LSJ$C}q]7#y6t hs.%7fu 7~[2{& x ](>B|>LWwiy=>,?^": <<8444751DFCD0354687F9FE76EBE71065>]>> Provide forms for placement of grout, as required. ph p he h;F B* 16010. DEMONSTRATION AND INSTRUCTIONS Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. New Construction: All new penetrations shall be provided with a pipe sleeve and sealant materials. SITE VISIT Prior to preparing the bid, the electrical subcontractor shall visit the site and become familiar with all existing conditions. Shop drawings detailing fabrication and installation requirements for electrical equipment. Warranties and bonds. 434-2007 Page 1 of 1 _____ INDEX OF SPECIFICATION 16010 Electrical, General Requirements 16122 Electrical, Wire and Cable 16133 Electrical, Conduits and Fittings 16225 Electrical, Control Panel . B. endstream endobj 4189 0 obj <. &F >`>a$gd$ ^ gd;F $ Reflected ceiling plan. Job site and worker safety are the responsibility of the contractor. Record documents. State of Maryland Fire Prevention Code. By closing this banner, or continuing to use this website, you consent to the use of cookies. REPAIRS & RESTORATION OF SURFACES AND FINISHES: Restore all finishes, equipment and surfaces to original condition, where affected by the work. Power Distribution System. Supplementary Conditions and Division-1 Specification Sections, apply to this Section. Samples shall indicate applicable specification section number and item numbers within that section. The contractor shall submit detailed riser diagrams detailing point-by-point connections. The contractor shall include in his price the cost of all premium time required for outages and other work which interferes with the normal use of the building, which will be performed, in most cases, during other than normal work time and at the convenience of the University. Install systems, materials, and equipment to conform with approved submittal data, to greatest extent possible. 0 endstream endobj 572 0 obj <> endobj 573 0 obj <> endobj 574 0 obj <>stream Schedule the preliminary and rough-in inspections in a timely manner. ADA (American with Disabilities Act). L1)Tj4d v"1s%H"r$-j` ,}# ELECTRICAL. endstream endobj 265 0 obj<> endobj 266 0 obj<>/Encoding<>>>>> endobj 267 0 obj<> endobj 268 0 obj<>/ProcSet[/PDF/Text]/ExtGState<>>> endobj 269 0 obj<> endobj 270 0 obj<> endobj 271 0 obj<> endobj 272 0 obj<> endobj 273 0 obj<> endobj 274 0 obj<> endobj 275 0 obj<> endobj 276 0 obj<>stream ?Cc\C,Ns[Tj*I3t3kZ pd(68 Ulz %%EOF CLOSEOUT PROCEDURES Operating and Maintenance Instructions: Submit Complete Package At Least Two (2) Months Prior To Substantial Completion. The work descried hereunder shall be installed subject to the Contractual Conditions for the entire Specifications. They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. Reference letters from minimum of three (3) registered professional engineers, general contractors, building owners, explaining proficiency, quality of work, or other attribute on projects of similar size or substance. PART 1 - GENERAL . Installers' qualifications refer to the materials and methods required for the surface and building components being patched. Section 16151 - Vertical Hollowshaft Electric Motors . Refer to contract drawings where access panels have been specifically located. Electrical Performance Specifications Skagway Bazaar Building - Skagway, Alaska Page 1 of 10 . Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. Packaging: Premixed and factorypackaged. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . 2020 0 obj <>stream Work with the other trades to ensure the material and equipment installed as part on the electrical system will not be in conflict with the installation of material and equipment by the other trade contractors. ELECTRICAL GENERAL PROVISIONS . [l*/ UL (Underwriters Laboratories). 2. This instruction period shall consist of not less than five (5) eight (8) hour days. Perform cutting, fitting, and patching of electrical equipment and materials required to: Uncover Work to provide for installation of ill timed Work. Properly store and handle all materials and equipment. {s@_yj1' 3{J1tB;=6bcC. In default thereof, owner may have such work done and charge the cost of same to the contractor. Coordination Effort: This coordination effort shall include detailing major elements, components, and systems of electrical equipment and materials in relationship with other systems, installations, and building components. 584 0 obj <>/Filter/FlateDecode/ID[<68D0A66D69CDF1FFF7626FF3652144DE><5293A0C1E7B0C14DBF1945BCD9C7F14E>]/Index[571 20]/Info 570 0 R/Length 71/Prev 500049/Root 572 0 R/Size 591/Type/XRef/W[1 2 1]>>stream EU PRODUCT DIRECTIVES a) The EU Product Directives deal with large families of products or horizontal risks, such as those addressed in the Electromagnetic CONSTRUCTION RECORD DOCUMENTS The electrical contractor shall maintain a set of construction record documents during the construction period in accordance with Specification Division 01 Section Project Closeout. 4188 0 obj <> endobj 2.0 GENERAL DESCRIPTION: A. shall meet the requirements of the associated spec section(s). endobj Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. Comply with manufacturer's instructions. The Architect/ Engineer will not perform any punch list verification until all items have been completed, initialed, dated and the list returned to the Architect/Engineer. Install equipment and materials in existing structures. [r'9}I!tn>oW KYa jRta4UIY3z$[gR%?F5r.jPSbei})lVZHk'vMTEJ|Agdd*z. Control. XB^c*x=.l0 r For equipment rough-in requirements see specifications for electrical equipment. OUTAGES For all work requiring an outage, the electrical contractor shall submit an outage request to the UMB Project Manager, using the UMB Standard Request for Outage Form which is available through the UMB Design and Construction Web Site at HYPERLINK "https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/" https://www.umaryland.edu/designandconstruction/design-and-construction-documents/umb-standard-project-forms---current-editions/ The existing mechanical/electrical systems shall remain operational unless turned off by University personnel during the construction of the project. Place grout on concrete bases to provide a smooth bearing surface for equipment. mHs00\%Q` i`h@M=#2Km,Iu9#y9Rd$gM$d,kVoN;$cJ+_:P:X:/}2P*C2P*C2X*c2X*c2X*cvgYt_{Mw?m{_/9Kt?to5hYE^E]_n]6#_\yn|02+=0PM1@T36YaeCb.c$PfHmT18f@5i32FMfp?M 0 Patch, repair and repaint all walls and surfaces cut, penetrated or otherwise disturbed by the work. &. Cutting, welding and burning Concrete housekeeping pads Grouting Protection of work Provisions for access Demonstration and instruction Equipment provided under another division or by others Record drawings Closeout procedures Inspections Demolition Repairs and restoration of surfaces and finishes Final cleaning Project punchout Summary of Work: Provide a complete integrated electrical system in accordance with the intent of these specifications and the accompanying drawings. Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. 4 | SECTION-16000 1.02 A. G.|,b43f`0pXaE"zs aN Clean surfaces that come into contact with grout. 3 0 obj Access shall be as required by code and/or as determined by the Architect and Engineer. Section 16010 - General Electrical Requirements . hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. Coordinate requirements for access panels and doors where electrical items requiring access are concealed behind finished surfaces. 8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS Latest Update 03-10-2022. Section 16010 General Electrical Provisions Section 16120 Wire and Cables Section 16130 Wiring Devices Section 16160 Pilot Devices . }H5@Gj\/vLBh@.\=r+TKi3Eg:xI=V{ T`WiRcfJ1Et*kIPd$ItI}J&]IES&IKO>Snv! endstream endobj startxref SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS SECTION 16111 - CONDUITS SECTION 16118 - DUCTBANK SECTION 16121 - MEDIUM VOLTAGE CABLE SECTION 16123 - BUILDING WIRES AND CABLES SECTION 16130 - BOXES SECTION 16140 - WIRING DEVICES SECTION 16160 - ENCLOSURES SECTION 16170 - GROUNDING AND BONDING SECTION 16180 - EQUIPMENT WIRING SYSTEMS SECTION 16190 All communication shall be through this person. %PDF-1.5 % Disconnect installed work as specified for testing. to a point below the finished floors or behind finished walls and cap. Browse Part Number 16010, Narrow Section Ball Bearings (16000, 16100) in the The Timken Company catalog including Part Number,Item Name,Description,Clearance,Bore Size d,Features,Outside Diameter D,Outside Ring Width B,Radius Rs min,Cr - Dynamic Load Div. Patch existing finished surfaces and building components using new materials matching existing materials and experienced Installers. Safety procedures. endstream endobj startxref If installers are not experienced in procedures, provide instruction by manufacturer's representatives. SUMMARY This Section includes general administrative and procedural requirements, as well as the following basic electrical materials and methods: Referenced organizations and codes Site visit Outages Installers qualifications Work performance Submittals Quality assurance Delivery storage and handling Sequencing and scheduling Variances Guarantee/warranty Listed manufacturers Approved equal equipment layouts Fire stops & smoke seals for wall & floor sleeve applications Coordination drawings Construction record documents Operation and Maintenance manuals electronic files Concrete housekeeping pads Grout Roughins Electrical installations. Examples of Sub Systems: Normal Power. Distribution panels. Notification of completion of testing shall be sent to the COMPANY . ?\ 2j0D,xl>Kc2)b01UBu0% ## d X%XIL See Architectural Specification Division 07, Section Penetration Firestopping for sealant material requirements. OSHA (Occupational Safety & Health Act). Prepare floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations. View Specification PDF - The Pennsylvania Turnpike. Diagrams shall indicate cable on raceway between points. Mandatory Requirements: The following requirements are mandatory: Protective Equipment: Electricians must use full protective equipment (i.e., certified and tested insulating material to cover exposed energized electrical components, certified and tested insulated tools, etc.) Floor Pipe Sleeves Applications: Pipe sleeves are required for all new conduit risers passing through floor slabs. PART 1 GENERAL RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other Electrical Specification Sections. Project Area: The project area shall include the finished spaces and related sections of the utility shafts within the project area footprint. Provide installation in accordance with recognized trade organizations and standards: NEMA. TURF CLUB 16010-1 GENERAL PROVISIONS MASTER F:\WORDPROC\ZEIJOBS\883-001\16010 SECTION 16010 GENERAL PROVISIONS PART 1 - GENERAL Related Documents: Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to this section. It is the responsibility of the Contractor and its subcontractors to review all sections and ensure a complete and coordinated project. No additional compensation will be made to the contractor as a result of his failure to familiarize himself with the existing conditions under which the work must be performed. Listing and Labeling Agency Qualifications: A Nationally Recognized Testing Laboratory (NRTL) as defined in OSHA Regulation 1910.7. Remove all electrical clippings, wiring, nuts, bolts, etc. See Specification Division 01 for general requirements. The following list shall be used as a guide only: Equipment such as transformers, generators, etc. endstream endobj startxref INSPECTIONS Contractor shall: Schedule, pay for (as applicable) and attend all inspections required by the Authorities Having Jurisdiction. o IBC (International Building Code). Arrange for each installer of equipment that requires regular maintenance to meet with the Owner's personnel to provide instruction in proper operation and maintenance. 301 and Section 16010 of these Specifications. Comply with requirements of governing regulations, franchised service companies, and controlling agencies. For each electrical outage request include a photograph of the panel index schedule for each panel affected by the outage. Replace ceiling tiles where removal has left holes or cuts in original tiles. 2006 0 obj <> endobj NECA Standards of Installation DELIVERY, STORAGE, AND HANDLING Deliver products to the project properly identified with names, model numbers, types, grades, compliance labels, and other information needed for identification. 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream The work to be done under this Division of the specifications consists of the fabrication, complete in all details, of the Electrical Work, at the subject premises, and all work and materials incidental to the proper completion of the installation, except those portions of the work which are expressly stated to be done by others. Part Number 16010, Narrow Section Ball Bearings (16000, 16100). NECA (National Electrical Contractors Association). Unless otherwise modified, provisions of General Conditions, Supplementary Conditions and Division-01 govern work under the Electrical Divisions. <> &%`T$cf:A5H(3Jy?'- ] Variable frequency drives. F. Supply Voltage Energized electrical conductors and circuit parts to which an employee might be exposed shall be put into an electrically safe work condition before an employee performs work any time the employee is within the limited approach boundary or, where an increased risk of injury from an exposure to an arc flash hazard exists. 11-254 95% Construction Document Submission Phase January 03, 2012 BASIC ELECTRICAL REQUIREMENTS 260000 / = > ? <>>> Machine name and specification section number of driven machine. SECTION 16010 . Refer to General Requirements of Division 01 for additional requirements pertaining to Submittals and Record Drawings. Servicing. For equipment requiring seasonal operation, perform instructions for other seasons at the same time. 8&Zdl6xHc`p(N:cy$f430o"NNN_r u2Mrf\[7Hcr Unless otherwise specified, outages of any services required for the performance of this contract and affecting areas other than the immediate work area shall be scheduled at least ten days (10) days in advance with the Office of Facilities Management. The Contract Documents are a single integrateddocument, and as such all Specification Sections apply. while working on energized systems in accordance with NFPA 70E.

Who Pays For The Wedding In Russia, Articles S

This Post Has 0 Comments

specification section 16010

Back To Top